Patch

Peach County
Basic Firefighter Academy

Nightly Sign-In Sheet
Night 11 · Fri, Oct 9, 2026 — Operations Ch 7 - Planning the Initial Response
Hours
4
Phase
Hazmat Operations
Equipment
Projector, whiteboard, scenario cards, portable radios

Turning information into a plan: understanding the situation, the incident action plan, and the site safety plan. Short lecture, long tabletop. Scheduled Fri, Oct 9, 2026, 1800-2200.

  1. Explain processes used to understand the situation at a hazmat incident (7.2.1, 7.3.1)
  2. Identify components of an incident action plan (7.3.1)
  3. Identify the purpose of a site safety plan (7.3.1)
  4. Skill Sheet 7-1 - identify strategies and tactics available at a hazmat incident
NameRankGFSTC #Signature
NameRankGFSTC #Signature

Recruits sign in here. Add your name, then tap to sign.

NameRankGFSTC #Signature
EquipmentDamagedComments
Punctual · Valuable · Selfless

Submitted

Stop — Check Your Work

Tick every box to confirm. PDF will not download until all 7 are checked.
Please check after yourself before downloading. If anything below is not done, go back and fix it before you submit.
  • Time is entered correctly in 24-hour format (e.g. 0800, 1330).
  • Hours are whole numbers only — NO .5. Use 3, 4, 8 — not 3.5.
  • Description and objectives are filled out correctly.
  • All personnel participating have signed.
  • Driver Training: If personnel did NOT drive, they do NOT sign — they need an Area Familiarization sign-in instead.
  • Facility training is 3 hours or more AND held at the training facility.
  • Reviewed everything above. Questions? Call Dorman BEFORE submitting.
0 of 7 confirmed

Sign Here